Services / Reconstruction & Build-Back - Commercial

Commercial Reconstruction & Build-Back · Since 2000

Loss Construction
— we don't just dry it out, we bring it back.

Most firms stop at mitigation and hand you a list of trades. We carry the file through the rebuild — by our own crews, on one schedule, in accordance with the insurance scope

THE BASICS

The rebuild is the second part of the loss — not a new project.

When mitigation ends, the building still isn't whole. That handoff — to a general contractor, a list of trades, months of coordination — is where the second part of the loss begins. C2C keeps the file: framing through finishes, sequenced by our own crews on one schedule, so the property is restored to pre-loss condition under one point of contact.

SCOPE OF WORK

Framing through finishes
— one schedule, one invoice.

Category 01

C2C

Structure

Framing, drywall, and envelope returned to pre-loss condition.

Category 02

C2C

Systems

Electrical, plumbing, and HVAC reinstated, in accordance with the insurance scope and code.

Category 03

C2C

Finishes

Flooring, paint, cabinetry, fixtures, and tenant-specific build-out.

THE C2C COMMERCIAL PROCESS

Pre-loss agreement → mitigation → restoration → sign-off.

C2C Process Steps

step one

Pre-loss Agreement

Rate sheet signed before anything happens; property added to the dispatch file for priority response. No charge until a loss occurs.

C2C Process Steps

step two

Mitigation

Stabilization placed before negotiation; crews dispatched immediately to the loss site, on-site within.

C2C Process Steps

step three

Restoration

Reconstruction performed in accordance with the insurance scope, by our own crews. Daily or weekly updates issued.

C2C Process Steps

step four

Sign-off

Final walk-through with owner and/or adjuster. One closing document as agreed by all parties.

CONTINUITY

Same owner, same dispatch line, same crews, same quality of work.

A single point of contact through sign-off means no re-bidding the job, no gap between the dry-out and the build-back, and documentation that stays continuous — scope-aligned, Xactimate-ready estimates and sequenced daily logs from the first call to the closing walk-through.

INSURANCE & DOCUMENTATION

We carry the documentation from mitigation through final sign-off — one file, one contact, one schedule.

Commercial Loss Construction moves on a documented scope. We produce Xactimate-aligned estimates, track permits by phase, and issue progress reports in a format carriers and property managers can act on — without chasing a separate contractor for updates.

C2C

Scope
of Work

Written rebuild plan aligned to the insurance scope — phased by area to keep occupied floors operational where possible.

C2C

Xactimate Estimates

Carrier-ready, line-item rebuild scopes produced before work begins and updated through any approved change orders.

C2C

Permit & Inspection Tracking

Permits pulled, inspections scheduled, and approval records maintained as part of the project file.

C2C

Photo & Video Record

Time-stamped documentation of structural work, material installation, and finished conditions through final sign-off.

C2C

Commercial build-back crews cover the full footprint.

We've staged crews and equipment across all five Southern California counties — Los Angeles, Ventura County, Santa Barbara County, Orange County, and San Diego County — since 2000.

RELATED SERVICES

Damage rarely arrives alone.

COMMERCIAL

Fire & Smoke

Common cross-over

Water Damage

The mitigation that precedes most rebuilds — extraction and drying.

Mold

If drying stalls

Fire & Smoke

Structural cleaning and deodorization before reconstruction begins.

Storm

Seasonal cause

Storm

Envelope failures stabilized, then framed and finished.

COMMON QUESTIONS

Commercial reconstruction, answered.

COMMERCIAL

Do you self-perform or sub it out?

Our own crews, on one schedule — that's the point of Loss Construction.