Commercial Reconstruction & Build-Back · Since 2000
Loss Construction
— we don't just dry it out, we bring it back.
Most firms stop at mitigation and hand you a list of trades. We carry the file through the rebuild — by our own crews, on one schedule, in accordance with the insurance scope
THE BASICS
The rebuild is the second part of the loss — not a new project.
When mitigation ends, the building still isn't whole. That handoff — to a general contractor, a list of trades, months of coordination — is where the second part of the loss begins. C2C keeps the file: framing through finishes, sequenced by our own crews on one schedule, so the property is restored to pre-loss condition under one point of contact.
SCOPE OF WORK
Framing through finishes
— one schedule, one invoice.
Category 01
Structure
Framing, drywall, and envelope returned to pre-loss condition.
Category 02
Systems
Electrical, plumbing, and HVAC reinstated, in accordance with the insurance scope and code.
Category 03
Finishes
Flooring, paint, cabinetry, fixtures, and tenant-specific build-out.
THE C2C COMMERCIAL PROCESS
Pre-loss agreement → mitigation → restoration → sign-off.
step one
Pre-loss Agreement
Rate sheet signed before anything happens; property added to the dispatch file for priority response. No charge until a loss occurs.
step two
Mitigation
Stabilization placed before negotiation; crews dispatched immediately to the loss site, on-site within.
step three
Restoration
Reconstruction performed in accordance with the insurance scope, by our own crews. Daily or weekly updates issued.
step four
Sign-off
Final walk-through with owner and/or adjuster. One closing document as agreed by all parties.
CONTINUITY
Same owner, same dispatch line, same crews, same quality of work.
A single point of contact through sign-off means no re-bidding the job, no gap between the dry-out and the build-back, and documentation that stays continuous — scope-aligned, Xactimate-ready estimates and sequenced daily logs from the first call to the closing walk-through.
INSURANCE & DOCUMENTATION
We carry the documentation from mitigation through final sign-off — one file, one contact, one schedule.
Commercial Loss Construction moves on a documented scope. We produce Xactimate-aligned estimates, track permits by phase, and issue progress reports in a format carriers and property managers can act on — without chasing a separate contractor for updates.
Scope
of Work
Written rebuild plan aligned to the insurance scope — phased by area to keep occupied floors operational where possible.
Xactimate Estimates
Carrier-ready, line-item rebuild scopes produced before work begins and updated through any approved change orders.
Permit & Inspection Tracking
Permits pulled, inspections scheduled, and approval records maintained as part of the project file.
Photo & Video Record
Time-stamped documentation of structural work, material installation, and finished conditions through final sign-off.
Commercial build-back crews cover the full footprint.
We've staged crews and equipment across all five Southern California counties — Los Angeles, Ventura County, Santa Barbara County, Orange County, and San Diego County — since 2000.
RELATED SERVICES
Damage rarely arrives alone.
COMMERCIAL
Common cross-over
Water Damage
The mitigation that precedes most rebuilds — extraction and drying.
If drying stalls
Fire & Smoke
Structural cleaning and deodorization before reconstruction begins.
Seasonal cause
Storm
Envelope failures stabilized, then framed and finished.
COMMON QUESTIONS
Commercial reconstruction, answered.
COMMERCIAL
Do you self-perform or sub it out?
Our own crews, on one schedule — that's the point of Loss Construction.